Eighteen transmission projects that can start construction by 2030, unlocking 65 GW of capacity and about $180 billion in net customer savings.
Download PDFThis OpenMinds analysis identifies 18 high-voltage transmission projects that can begin construction by 2030 and together unlock 65 GW of grid capacity. The projects target regions with high load growth, including Texas, Virginia, the Southeast and the Northwest, and add transfer capability between regions to ease transmission bottlenecks.